Guide map, City of Hamina

Water supply and street structure studies in Poitsila

According to preliminary plans, ground investigations in the street area will be carried out from Monday 08.06.2026. The street areas to be investigated are Mustakorventie, Mäntytie, Leppätie, Metsämäentie and Katajarinne. The ground investigations will last approximately 2 weeks and the work will be carried out between 8 am and 16 pm. The work will cause some dust and noise nuisance. When drilling on the roadway, the auger is equipped with a flashing light and the location will also be marked with road cones. Street traffic will not be blocked during the investigations, but it may cause minor inconvenience at times. The investigations will be carried out for the City of Hamina and Haminan Vesi.